Time-Lapse of Irvine Load-In (Video)

News

< Go Back
  • Time-Lapse of Irvine Load-In (Video)

    As Mojo Tour Production manager Ken Graham explains in his video interview here (link), the process of loading all the gear into a venue for any given night’s show is a long process which begins at 7am. Check out this time-elapse video of the load-in at the Verizon Wireless Amphitheater in Irvine, CA on October 2.

    Mojo Tour 2010